St. Francis-in-the-Field Episcopal Church*

*Individual Experience at Previous Firm

The first phase of the 45 acre campus started with the main sanctuary and the educational building. This was an untouched site and utilities and roadways had to be brought in to accommodate the churches needs. Needing to be accommodating to future buildings that will be added in future phases required being very selective in the location of utility lines, water, power and sewer so as to be the most economical from Point A to Point B.

 

The campus style master plan consists of a sanctuary with seating for 300 people, administrative building, assembly spaces and a chapel with seating for up to 400. Many natural materials were used complimenting the surrounding environment.

 

Project Information:

 

Project Scope:

Master Planning & New Construction

 

Size:

Sanctuary – 5,200sf

Administration – 2,800sf

 

Final Construction Cost:

$1,400,000

 

Date of Completion:

June 2002

Services Provided:

Conceptual Design

Programming

Plans & Specifications

Renderings

Construction Documents

Cost Estimationg

Construction Administration

Bidding / Negotiation

Conducted /Attended Preconstruction Meetings

Preparation of Change Orders

Project / Permit Certifications